Welcome to Suzhou BAUTZ automation equipment Technology Co., Ltd. website!

苏州宝得瑞自动化设备科技有限公司,,物流分拣线,连续式提升机,自动化装配生产线厂家

National Service Hotline

0512-57810358

What problems should be paid attention to in the design, installation and debugging process of motor embedded assembly line?
Classification:View of Bao DeruiTime:2026-08-06

What problems should be paid attention to in the design, installation and debugging process of motor embedded assembly line?

Points for attention in the whole process of design, installation and debugging of motor embedded assembly line

The wire embedding section of the motor belongs to the core process of motor manufacturing, and the process includes: stator feeding → insulating slot paper embedding → wire embedding → wire pressing → end shaping → binding → detection before dipping → transportation. Most of the products are stator core assemblies, and the workpieces are precise and the enameled wire is easily damaged, which requires extremely high conveying stability, position positioning accuracy, anti-collision and cleanliness. It is very different from ordinary sheet metal assembly line. The key risk points are sorted according to the scheme design stage → factory prefabrication stage → site installation stage → commissioning stage → commissioning verification, which can be directly used as the basis for technical review and project management and control.


Return

SUZHOU BAUTZ AUTOMATION EQUIPMENT苏ICP备16057245号-1

Add:Address: No.2 Xugongqiao Road, huaqiao town, Kunshan City, Jiangsu, China Province

Phone:13918013760(Mr Li)

Copyright piracySupport:UWEBSitemap