Welcome to Suzhou BAUTZ automation equipment Technology Co., Ltd. website!

宝得瑞自动化,苏州宝得瑞自动化设备科技有限公司,电力电柜装配线,物流分拣线,电机装配线,电机嵌线装配线,连续式提升机输送,电视机装配生产线,电视机检测输送线,壁挂式空调装配生产线,空调外机装配生产线,伸缩皮带机,倍速链装配线,曳引机装配线

National Service Hotline

0512-57810358

Suzhou Baoderui Automation introduction: How to determine the production efficiency of the assembly line?
Classification:View of Bao DeruiTime:2024-05-25

Suzhou Baoderui Automation introduction: How to determine the production efficiency of the assembly line?




Assembly line is a widely used production line in the assembly industry. The production efficiency of the assembly line refers to the actual output standard working time. So how to determine the production efficiency of the assembly line, according to what to calculate its production efficiency? Suzhou Baoderui automation here is a simple share.


Television assembly line


Standard working hours on the assembly line: under normal circumstances, the effective action time from parts to finished products directly affects the completion of finished products, including direct working hours and indirect working hours. That is, the sum of the effective working time of all stations for processing each product (set);


Assembly line standard working hours formulation method: all the effective working hours of each existing station (skilled workers) are measured, and the working hours of all the processing stations of the components of the product are calculated after considering the balance of workshop production, the impact of the environment on workers, and the fatigue production information of workers.


Direct working hours: refers to the working hours of personnel working directly;


Indirect working hours: refers to the personnel who carry out the necessary management and auxiliary operations for the direct workers on the site. According to the characteristics of the management organization of the workshop on the site, the working hours generated by the workshop except the director and the direct workers;


Standard manpower: refers to the reasonable quantity of manpower allocated by the production unit according to the standard working hours and actual production conditions under the premise of the set output target;


Then the production efficiency of the assembly line: actual output × standard working hours; Actual manpower ×8.00 hours - stoppage hours + overtime hours.


Each production unit on the assembly line only focuses on processing a certain segment of work, and the assembly line can be roughly divided into seven categories of assembly lines according to the transmission method of the assembly line: belt assembly line, plate chain assembly line, double speed chain assembly line, plug-in line, mesh belt assembly line, suspension assembly line and drum line.


Return

SUZHOU BAUTZ AUTOMATION EQUIPMENT苏ICP备16057245号-1

Add:Address: 550 Xinghui Road, Kunshan Economic Development Zone

Phone:13918013760(Mr Li) 13795364038(Mr Lang)

Copyright piracySupport:UWEBSitemap